FolioObs › ROCKET LAB (RKLB) › Earnings calls

ROCKET LAB earnings calls

RKLB · every analyst question and management's answer

Aug 10, 2026 earnings call — Record quarter and Iridium acquisition plans

Rocket Lab reported record Q2 revenue of $234 million and announced intent to acquire Iridium to enter space applications.

Revenue $0.2B (est $0.2B) · EPS $-0.08 (est $-0.06) · Next-quarter revenue outlook $0.3B–$0.3B

Key quotes

"Our pending Iridium acquisition is a strategic move that will combine Rocket Lab's launch capability and satellite manufacturing with Iridium's global satellite communications network and rare spectrum."

— Peter Beck (CEO) · Iridium acquisition

"Production currently lines up with the target delivery of Neutron to the pad in Q4 2026."

— Peter Beck (CEO) · Neutron development

"With GHOST, we deliver the rocket launch infrastructure, ground support and range control systems and shipping containers establishing launch capability and new locations on rapid time lines."

— Peter Beck (CEO) · Launch demand and GHOST

Analyst Q&A 13

Neutron launch scale and pricing

Q (Andres Sheppard-Slinger · Cantor Fitzgerald): Analyst asked how quickly Neutron could scale to about 10 launches and whether the ramp could be accelerated, and asked about future ASPs for Neutron, Electron, and HASTE.

A: Management said the focus is on reaching flight 10 quickly by designing for reusability and avoiding requalification between early flights. They described a 1, 3, 5 ramp informed by Electron and said ASPs were set at $50 million to $55 million for Neutron and they see more upside than downside for pricing as demand firms.

"So for us, that's really all about reusability and we're constantly trading the time lines and the qualification criteria for the various systems and subsystems to get to the pad on for flight 1, but also making sure that when it comes to flight 10 that we don't have to go back and requalify things." — Peter Beck (CEO)

Iridium synergies and GHOST

Q (Jeff Van Rhee · Craig-Hallum Capital Group): Analyst asked what new opportunities Iridium unlocks through vertical integration and how Neutron launches will be assigned, and asked about the genesis and customers of GHOST.

A: Management said owning Iridium lets them build and launch their own satellites, creating cost advantages and new opportunities while balancing capacity between commercial, government, and their own constellation needs. On GHOST, they said it was developed at a customer's request to meet HASTE needs for more mobile launch capability and that Electron-scale pad infrastructure is easier to move.

GHOST pricing and Kodiak CapEx

Q (Trevor Walsh · Citizens): Analyst asked how GHOST-enabled (HASTE) launches should be priced and whether the Kodiak site requires extra CapEx beyond current guidance.

A: Management said HASTE missions out of the West Coast should be priced similar to prior HASTE pricing and that increasing strategic demand could push ASPs higher as seen in Electron. For Kodiak, they said some CapEx is required but it's relatively small and much of it is funded in customer contracts.

"So I think you should look at pricing to be pretty consistent with what we've been showing on HASTE." — Adam Spice (CFO)

Iridium next-gen timing and contract ramp

Q (Xin Yu · Deutsche Bank): Analyst asked whether Rocket Lab plans to deploy Iridium's next-gen constellation sooner than mid-2030s and how to think about timing and lumpiness of recent satellite contract ramps.

A: Management said L-band spectrum makes Iridium's current services sticky and important now and in the future, and they are not ready to discuss a next-gen constellation timeline yet. For government contracts, they said typical program revenue ramps follow a roughly 10, 40, 40, 10 curve over about 4 years, though each program differs.

"I mean these programs are the ones that last for, call it, 4 years and the kind of 10, 40, 40, 10 kind of curve is still looking to be approximately right." — Adam Spice (CFO)

Spacecraft components and HASTE contract details

Q (Jan-Frans Engelbrecht · Baird): Analyst asked which spacecraft components present the biggest opportunities and capacity outlook, and asked whether the $266 million HASTE contract mixes launch pricing and pad build funding.

A: Management said spacecraft components are a strong moat and their scale lets them supply large quantities and be competitive on big programs, noting solar manufacturing scaled significantly. On the HASTE contract, they confirmed infrastructure funding is mixed into the $266 million, launches will be recognized at standalone prices, and infrastructure shows up as CapEx and separate revenue.

Iridium spectrum and Mynaric margins

Q (Erik Rasmussen · Stifel): Analyst asked if Iridium could expand into broadband and asked for current and target gross margins for Mynaric and timing to reach them.

A: Management said L-band is the wrong spectrum for broadband and they see limited rationale to compete in broadband against large players, while L-band has unique capabilities. On Mynaric, they said margins were initially pressured due to prior insolvency and supply issues, they can't give exact current margins after one quarter of ownership, but expect margins to align with Space Systems merchant business over a few quarters with revenue growth and cost actions.

"Going forward, we think this business will really kind of look in line with the rest of our Space Systems kind of merchant business." — Adam Spice (CFO)

Neutron milestones and Europe interest

Q (Benjamin Johnson · Piper Sandler): Analyst asked the biggest risks to getting Neutron to the pad in 4Q and asked about early signs of European customer interest from the Mynaric deal.

A: Management said stage testing is the highest-risk milestone because it involves igniting fueled engines on the pad, and after that there are smaller remaining milestones. On Europe, they said geopolitical tensions have driven nations to seek sovereignty, creating opportunities for Rocket Lab to help with satellite and possibly launch needs as Europe lacks frequent launch capability.

"Yes, Ben, probably the stage testing is always the thing that gets your adrenaline running because you have fully fueled vehicles on the pad." — Peter Beck (CEO)

Free cash flow and Neutron order cadence

Q (Kristine Liwag · Morgan Stanley): Analyst asked why cash burn was higher in the quarter and whether Neutron orders will accelerate as test flight nears, plus whether 2Q was peak free cash outflow.

A: Management said higher cash burn came from building Neutron tails for rate and replenishing Mynaric supply chains. They said Neutron sales are being managed carefully due to constrained launch supply and existing government and own needs, and free cash flow cadence depends heavily on timing of the first successful Neutron test flight, with adjusted EBITDA turning positive the quarter after and cash flow positivity 18 to 24 months later absent Iridium closing.

"So a significant amount of the spend or cash flow consumption in the quarter was driven by building out the subsequent tails for Neutron, right?" — Adam Spice (CFO)

Space Systems product mix and margins

Q (Ryan Koontz · Needham & Company): Analyst asked for product mix color in Space Systems for the June quarter, timing for SDA Tranche 2 and 3, and gross margin mix excluding Mynaric.

A: Management said mix varies between merchant components and programmatic satellite platforms, with component products having a wide margin spread and platforms like SDA Tranche 2/3 in the mid-30s gross margin. They cautioned that quarterly results depend on how much high-margin components ship versus programmatic work, which is more predictable.

"We have some component solutions such as solar that are always going to be more towards the lower end, call that in the kind of -- and then if you look towards some of the product areas, they can be more kind of north of 70 points of gross margin." — Adam Spice (CFO)

Neutron demand and future capacity

Q (Gautam Khanna · TD): Analyst asked if Neutron orders will surge after a successful test flight and whether a competitor's larger vehicle could create future capacity concerns.

A: Management said demand for Neutron is not a concern either before or after test flight and they've sold full-price Neutrons pre-test. They also said industry launch capacity will likely remain constrained because new providers' capacity is often reserved for their own internal programs, so constrained market persists.

"So I think pre-test flight, post-test flight, I would say Neutron demand is just not a concern." — Peter Beck (CEO)

Mars program update and NSSL timing

Q (Edward Morgan · BTIG): Analyst asked for an update on the Mars Telecommunications Orbiter procurement and when NSSL task orders should follow a Neutron launch.

A: Management said they are waiting for NASA's procurement process and hope for an update soon, and they feel well positioned though must wait for NASA. On NSSL task orders, they said timing is out of Rocket Lab's control and task orders are released in set periods, though the government is eagerly awaiting Neutron.

"So we're waiting for NASA to go through their procurement process." — Peter Beck (CEO)

Orbital data centers and M&A plans

Q (Michael Leshock · KeyBanc): Analyst asked whether orbital data centers are a real opportunity for Rocket Lab and whether M&A will continue after Iridium, and which areas they'd target.

A: Management said orbital data centers are a real opportunity but the scale is uncertain; they have developed higher-efficiency solar cells aimed at that market and would be well positioned if it grows. On M&A, they said tuck-ins are likely and Iridium is a starting point, not an endpoint, and they may pursue more deals to build applications capabilities.

"I guess I'm still a little bit cautious on the scale in which they may be a thing." — Peter Beck (CEO)

Neutron customer comfort and Flatellite

Q (Sujeeva De Silva · ROTH Capital): Analyst asked when customers will feel as comfortable ordering Neutron as they do Electron through the 1, 3, 5 sequence, and asked about Flatellite features and market opportunities.

A: Management said demand and customer comfort already feel close to that now given high pre-orders and limited initial supply, so they must be careful where capacity is allocated. They described Flatellite as a high-cadence platform for many satellites per launch, noted their first customer is a key U.S. government program, and said Flatellite will also benefit commercial customers and Rocket Lab's own future builds.

"It almost feels like that now, to be honest with you, as I mentioned before, we have a very limited supply of Neutrons coming out of the gate, and we have to be very, very careful with where we put those." — Peter Beck (CEO)

AI-generated notes on the earnings call transcript. Quotes are taken from the transcript. This is not a FolioObs investment view.

ROCKET LAB (RKLB) · Earnings calendar

Other earnings calls this week

  • GOOGL · ALPHABET INC — Gemini 4 models and Cloud TPU scaling
  • AMZN · AMAZON.COM INC — AWS AI growth and company results
  • MSFT · MICROSOFT CORP — Copilot expansion and AI-driven Azure growth
  • GOOG · ALPHABET INC-CL C — Gemini 4 launch and Cloud TPU scaling
  • V · VISA INC — Tokenization, VAS growth, and agentic commerce focus
  • MA · MASTERCARD INCORPORATED — Network expansion and agentic commerce push
  • SPGI · S&P GLOBAL INC — Strategic review of Capital IQ and data businesses
  • DASH · DOORDASH INC - A — Instacart deal and DashMart expansion

All of this week's earnings call summaries

FolioObs Features | 주요 기능

  • Dashboard — SEC 13F Portfolio Tracker, FolioObs 50 | 대시보드
  • AI Insights — Portfolio Analysis & Signals | AI 인사이트
  • Insider Trading — SEC Form 4 Tracker | 내부자 거래
  • Cathie Wood Today's Trades + AI Insights | 캐시 우드 오늘의 매매
  • ARK Invest Report — Daily Trades | ARK 리포트
  • Investment News — Data-Driven Updates | 뉴스
  • Weekly Report — Market Movers | 주간 리포트
  • How to Read a 13F — 5-Minute Guide | 13F 읽는 법
  • The FolioObs 50 — All Tracked Investors | FolioObs 50 전체 보기
  • Wall Street Consensus — Shared Holdings | 월가 컨센서스
  • US Politician Trades — STOCK Act | 정치인 매매 추적
  • Earnings Calendar | 실적 발표 캘린더
  • This Week's Earnings Call Summaries | 이번 주 어닝콜 한 줄 요약

FolioObs 50 | 추적 중인 월가 투자자 50인

  • Warren Buffett — Berkshire Hathaway | 워렌 버핏
  • Cathie Wood — ARK Invest | 캐시 우드
  • Stanley Druckenmiller — Duquesne Family Office | 스탠리 드러켄밀러
  • Ray Dalio — Bridgewater Associates | 레이 달리오
  • George Soros — Soros Fund Management | 조지 소로스
  • Bill Ackman — Pershing Square Capital | 빌 애크먼
  • David Tepper — Appaloosa Management | 데이비드 테퍼
  • Chase Coleman — Tiger Global Management | 체이스 콜먼
  • Dan Loeb — Third Point | 댄 로엡
  • Seth Klarman — Baupost Group | 세스 클라만
  • National Pension Service (NPS) — Korea National Pension Service | 국민연금
  • David Einhorn — Greenlight Capital | 데이비드 아인혼
  • John Paulson — Paulson & Co | 존 폴슨
  • Howard Marks — Oaktree Capital Management | 하워드 막스
  • Leon Cooperman — Omega Family Office | 레온 쿠퍼먼
  • Ken Griffin — Citadel | 켄 그리핀
  • Steve Cohen — Point72 Asset Management | 스티브 코헨
  • Li Lu — Himalaya Capital | 리 루
  • Mohnish Pabrai — Pabrai Investment Funds | 모니시 파브라이
  • Bruce Berkowitz — Fairholme Capital Management | 브루스 버코비츠
  • Nelson Peltz — Trian Fund Management | 넬슨 펠츠
  • Carl Icahn — Icahn Capital | 칼 아이칸
  • Paul Singer — Elliott Management | 폴 싱어
  • Philippe Laffont — Coatue Management | 필립 라퐁
  • Andreas Halvorsen — Viking Global | 안드레아스 할보르센
  • Daniel Sundheim — D1 Capital | 다니엘 선드하임
  • Masayoshi Son — SoftBank Group | 손정의
  • Terry Smith — Fundsmith | 테리 스미스
  • Joel Greenblatt — Gotham Asset Management | 조엘 그린블랫
  • Bill Miller — Miller Value Partners | 빌 밀러
  • Brad Gerstner — Altimeter Capital | 브래드 거스트너
  • Rajiv Jain — GQG Partners | 라지브 자인
  • Duan Yongping — H&H International | 돤융핑
  • Chris Hohn — TCI Fund Management | 크리스 혼
  • Stephen Mandel — Lone Pine Capital | 스티븐 만델
  • Prem Watsa — Fairfax Financial | 프렘 왓사
  • Sequoia Fund — Ruane Cunniff & Goldfarb | 세쿼이아 펀드
  • Guy Spier — Aquamarine Capital | 가이 스파이어
  • Lee Ainslie — Maverick Capital | 리 아인슬리
  • David Abrams — Abrams Capital | 데이비드 아브람스
  • Pat Dorsey — Dorsey Asset Management | 팻 도시
  • Dev Kantesaria — Valley Forge Capital | 데브 칸테사리아
  • Francois Rochon — Giverny Capital | 프랑수아 로숑
  • Thomas Russo — Gardner Russo & Quinn | 토마스 루소
  • Tweedy Browne — Tweedy Browne | 트위디 브라운
  • Temasek — Temasek Holdings | 테마섹
  • Saudi PIF — Public Investment Fund | 사우디 국부펀드
  • Baillie Gifford — Baillie Gifford | 베일리 기포드
  • Ron Baron — Baron Capital | 론 배런
  • Thomas Gayner — Markel Group | 토마스 게이너